Jackfish Community Hall Next Steps

Share Jackfish Community Hall Next Steps on Facebook Share Jackfish Community Hall Next Steps on X (formerly Twitter) Share Jackfish Community Hall Next Steps on Linkedin Email Jackfish Community Hall Next Steps link

Your Community. Your Taxes. Your Choice.

A referendum vote on the Jackfish Lake Community Space Service Establishment is happening on October 17, 2026, alongside the General Local Election.

A tax calculator tool and more information on the referendum vote is available at prrd.bc.ca/JackfishCS. Please take a moment to review the project page for a recap of the public engagement feedback and other project details.

For more information on voter eligibility and what you need to vote, visit prrd.bc.ca/Votes.

Don’t miss this opportunity to make your voice heard. Show up to vote this October!


The Peace River Regional District (PRRD) engaged Jackfish residents to review the results of a recent building condition assessment and provide input on the future of the Jackfish Community Hall, located at 1515 Old Jackfish Road.

The hall, located outside of Chetwynd, is owned by the PRRD and historically was operated by the Jackfish Lake Community Club.

A facility assessment in 2021, coupled with damage from a heating failure, determined that the facility needs substantial repairs, maintenance and upgrades to improve fire safety and accessibility. The facility has been closed since 2021 due to these factors. The hall currently lacks a consistent way to fund the repairs and ongoing operations of the building, relying on temporary grants and fundraising.

Based on feedback gathered throughout the various public engagement periods, the option being proposed through the referendum is to reopen the existing community hall.

Your Community. Your Taxes. Your Choice.

A referendum vote on the Jackfish Lake Community Space Service Establishment is happening on October 17, 2026, alongside the General Local Election.

A tax calculator tool and more information on the referendum vote is available at prrd.bc.ca/JackfishCS. Please take a moment to review the project page for a recap of the public engagement feedback and other project details.

For more information on voter eligibility and what you need to vote, visit prrd.bc.ca/Votes.

Don’t miss this opportunity to make your voice heard. Show up to vote this October!


The Peace River Regional District (PRRD) engaged Jackfish residents to review the results of a recent building condition assessment and provide input on the future of the Jackfish Community Hall, located at 1515 Old Jackfish Road.

The hall, located outside of Chetwynd, is owned by the PRRD and historically was operated by the Jackfish Lake Community Club.

A facility assessment in 2021, coupled with damage from a heating failure, determined that the facility needs substantial repairs, maintenance and upgrades to improve fire safety and accessibility. The facility has been closed since 2021 due to these factors. The hall currently lacks a consistent way to fund the repairs and ongoing operations of the building, relying on temporary grants and fundraising.

Based on feedback gathered throughout the various public engagement periods, the option being proposed through the referendum is to reopen the existing community hall.

Discussions: All (1) Open (1)
  • Estimated Costs

    5 months ago
    Share Estimated Costs on Facebook Share Estimated Costs on X (formerly Twitter) Share Estimated Costs on Linkedin Email Estimated Costs link

    If approved through a referendum, development and renovations to the facility will have ongoing expenses that would be paid through taxation. 

    The following taxation estimates are based off a proposed service area map. Note that this service area is still subject to Ministerial approval.


    Estimated Annual Costs

    Estimates for tax rates are calculated on the value of all improvements (this includes taxing on buildings only and does not include the value of the land). 

    Costs for the Community Hall include: 

    • PRRD Expenses 
    • Grant to Society for operation of the building (utilities, internet access, liability insurance, maintenance, janitorial supplies, health permitting) 
    • Capital Reserve Contributions (held by the Regional District to fund future large-scale repairs, upgrades, and eventual replacement) 
    • Annual debt repayment 

    Estimated annual cost: $70,000-$90,000 per year, which may decrease or increase based on actual costs.


    How to Estimate Your Annual Tax

    1. Visit bcassessment.ca
    2. Search for your property using the “Find your property assessment” tool
    3. Locate the “Improvements Only” value (building value, not land)
    4. Divide that value by 1,000
    5. Multiply by the tax rate for your preferred option

    Example:
    $150,000 ÷ 1,000 = 150
    150 × 0.23 = $34.50 per year

    Note: Estimates are based on 2025 assessment values. Actual costs may vary.

    If approved through a referendum, development and renovations to the facility will have ongoing expenses that would be paid through taxation. 

    The following taxation estimates are based off a proposed service area map. Note that this service area is still subject to Ministerial approval.


    Estimated Annual Costs

    Estimates for tax rates are calculated on the value of all improvements (this includes taxing on buildings only and does not include the value of the land). 

    Costs for the Community Hall include: 

    • PRRD Expenses 
    • Grant to Society for operation of the building (utilities, internet access, liability insurance, maintenance, janitorial supplies, health permitting) 
    • Capital Reserve Contributions (held by the Regional District to fund future large-scale repairs, upgrades, and eventual replacement) 
    • Annual debt repayment 

    Estimated annual cost: $70,000-$90,000 per year, which may decrease or increase based on actual costs.


    How to Estimate Your Annual Tax

    1. Visit bcassessment.ca
    2. Search for your property using the “Find your property assessment” tool
    3. Locate the “Improvements Only” value (building value, not land)
    4. Divide that value by 1,000
    5. Multiply by the tax rate for your preferred option

    Example:
    $150,000 ÷ 1,000 = 150
    150 × 0.23 = $34.50 per year

    Note: Estimates are based on 2025 assessment values. Actual costs may vary.

    You can use @ to tag somebody in the conversation

    Reply notification settings
    Email
    loader image
    Didn't receive confirmation?
    Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
    Submitting your comment
    Cancel
Page last updated: 09 Sep 2026, 04:24 PM