Methodology
The feasibility study that was conducted by Urban Systems and the PRRD included:
- Distribution and review of residents’ survey.
- Discussions with the Ministry of Transportation and Infrastructure (MoTI) on their road design, templates and their maintenance expectations.
- Development of a trail concept plan.
- Development of concept sections for five different options.
Options
- Road cross-sections to meet current MoTI standards.
- Trail placement relative to property lines.
- Lighting in three configurations: along street, intersections only and trail only lighting.
Share Methodology on Facebook
Share Methodology on Twitter
Share Methodology on Linkedin
Email Methodology link
